Skip to main content
Call Dan

Aberystwyth · Interior Decorating

Period interior redecoration in Aberystwyth — The Villas

Prepared period interiors, a navy staircase and pale architectural details at The Villas.

Period interior redecoration in Aberystwyth — The Villas

The work at The Villas, Aberystwyth, covered the staircase, landing and adjoining interiors within the wider Old College restoration project. Existing wall surfaces and repairs needed preparation before the navy scheme and pale architectural details could be finished.

The problem found

Existing wall surfaces and repairs needed preparation before the navy scheme and pale architectural details could be finished.

Preparation carried out

I prepared and filled the existing wall surfaces.

Products & finishes used

Navy walls with pale arches and mouldings.

TODO — Dan to confirm the product names used.

How long it took

TODO — Dan to add how long it took for this project.

A challenge solved

I worked around the existing arches, mouldings and fireplace within the contractor teams on the wider restoration.

Working with the period details

The arches, mouldings and fireplace were part of the existing interiors. Preparation and finishing had to follow these details carefully. I carried out the decorating within contractor teams on the wider restoration; The Villas are shown separately from the main Old College building.

Before and after

Tap a photograph to view it in full.

The navy staircase

The arched stair area

The room with the fireplace

The landing

Around the architectural details

During the work

The result

The finished navy walls sit alongside pale arches and mouldings, making the shapes of the staircase and landing clear. The same approach continues into the adjoining room and around the smaller architectural details.

Your project

What would you like to change?

Send me a short message and a few photos if you have them. I’ll talk through the work and timing with you.

Tell me about your project ↗